Ideal Lifts

Blog

Existing building - Church with Timber Frame
Apartments

Out with the old, in with the new!

This redeveloped Church building incorporates a new timber frame within the old existing exterior.
Ideal Lifts installed 3 passenger lifts within our Ideal Lifts Frame System for OFFSITE Construction.

View Post
Offsite & Structural Timber Awards Finalists
Commercial Offices

Double Industry Awards Finalists

Ideal Lifts Ltd. are thrilled to have been shortlisted for two separate industry awards, for our lift installations within our Ideal Lifts Frame System at the Black & White Building, London’s tallest mass timber office building designed by Waugh Thistleton Architects.

View Post
Flagship SEN School - Ideal Lifts
Ideal Lifts Frame System

Modular Flagship SEN School

Ideal Lifts were approached by a specialist education Modular construction company when they needed a lift for a new SEN School in Hastings.

View Post
News

Double Accreditation News

Ideal Lifts Limited are delighted to announce that we have recently completed our Safety Schemes in Procurement (SSiP) accreditation for this year with Acclaim. SSIP

View Post
Building
Apartments

BS EN 81-72 Firefighters Lifts

Showcasing our latest double lift installation, including a BS EN 81-72 Firefighting lift. Ideal Lifts installed a pair of lifts into this prestigious development of private apartments and penthouses on the seafront in Hove. The scheme comprises of 52 flats which are a mix of 1, 2 & 3 beds.

View Post
Barking London
Anti-Vandal Lift

Barking, London: Modular

Our ground-breaking compact frame-mounted lift was the ideal solution to meet the needs of this Modular client, who came to us after their original lift contractor couldn’t measure up.

View Post
Building
IL4

Staffordshire

There will be no weights for these lifts, our super energy efficient 8 person IL3 Eco-Drive passenger lifts make these exciting facilities accessible for all, in the new spa & leisure and indoor golf park in Staffordshire.

View Post
Building
Apartments

Northampton II

One of our repeat customers approached us with a project comprising of an existing 3-storey accommodation block in Northampton.

View Post
External Shot of Building
Care Home

Northampton

One of our repeat customers came to us with a two-lift redevelopment project for a timber frame care home in Northampton.

View Post
Commercial Office
Commercial Offices

Godalming

The clients came to us with a commercial renovation project in the heart of Godalming. A 3-storey office block.

View Post
Building
Apartments

Eastbourne

Ideal Lifts installed an Eco-Drive machine room-less (MRL) 8-person traction passenger lift into this traditional build residential development.

View Post
Artist Impression of Building
Apartments

Ollerton

Ideal Lifts installed a 6 person, 3 stop passenger lift into the first phase of this timber framed residential development.

View Post
Derby Light Gauge Steel LGS Development
Apartments

Residential Lift in Derby

Our Ideal Lifts Frame System enables the use of standard LGS wall panels throughout the building, speeding up production and the whole lift shaft construction.

View Post
Building
Apartments

Horsham

With a private housing development in close proximity to the train station where space was at a premium, the client came to Ideal Lifts for one of our industry leading compact designs.

View Post
Building
Apartments

Royal Leamington Spa

Installation of 6 passenger lifts for phase 1 of this development which comprised a mixture of luxurious apartments, penthouses and family homes.

View Post
Care Home Building
Care Home

Care Home in Winnersh

Ideal Lifts 8 and 13-person high efficiency motor room less passenger lifts, fitted with contemporary laminated wall boards and low energy LED lighting.

View Post