Commercial Offices
Timber
The clients came to us with a commercial renovation project in the heart of Godalming. A 3-storey office block.
Our energy efficient IL3 Eco-Drive was fitted into the Ideal Lifts Frame System, which is an innovative stand-alone structure that negates the need for traditional concrete lift shaft construction. Smarter than traditional construction, its unique design ensures that that only a standard lift shaft is required.
The Ideal Lifts Eco-Drive passenger lift uses 35% less electricity than conventional lifts and can achieve two BREEAM credits. Available in three phase, 415 volt or single phase, 240-volt in our 6-person (450kg) and 8-person (630kg) lifts.
Our ‘Essential’ car was installed on this project, with a contemporary satin steel lacquered effect internal car finish. To compliment the internal car finish, our optional satin stainless-steel landing doors were fitted.
This lift was also fitted with our new Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site, resulting in improved response times for faults and reduced lift downtimes by knowing which replacement part is needed before we even attend site.