Categories
Ideal Lifts Frame System IL2 School Structures Timber Construction

New Lift in Timber School, Chelmsford

New Lift in Timber School, Chelmsford

Interestingly, this new school project first came to us as an enquiry from a repeat Modular Construction client, before we then received another enquiry, this time it was for a timber frame build.  Ideal Lifts are specialists in lift installations for all Modern Methods of Construction (MMC) using our Ideal Lifts Frame System.

The end client eventually decided on the timber frame contractor, and Ideal Lifts were chosen to install the lift into this new 2-storey school in Chelmsford.

The contractor chose to install one of our traction IL2 Hybrid Access Passenger Lifts, which offers all the design and functionality of conventional passenger lifts and is designed to fit in only a 150mm pit with 2750mm headroom.

Provided with a motor room less (MRL) low energy traction-drive, which is integrated into the lift shaft, and unlike traditional hydraulic platform lifts there is no need for a separate (non-fire rated) control cabinet.

Our IL2 Hybrid range comes with automatic sliding doors, one-touch push button controls, 2-hr fire certified landing entrances and an enclosed cabin.

This project was one of the first with our new standard linear LED lighting and also included an optional restricted key fob access to allow the school to limit the use of the lift.

All of our lift installations are Open Protocol and are fitted as standard with our Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site.

Categories
News News New Lifts

The Ideal Lifting Beam Solution – Shortlisted!

The Ideal Lifting Beam Solution – Shortlisted!

The team at Ideal Lifts Ltd. are delighted to have our UK-manufactured Ideal Lifting Beam Solution shortlisted for another award.

This time it’s the Modern Methods of Construction Awards.

A pioneering innovation in lift shaft construction, the Ideal Lifting Beam Solution sets a new standard for safety, speed and simplicity in lift installation.  At its core is a single, precision-engineered, off-site-manufactured light-gauge steel beam, featuring an integrated lifting eye and multiple positioning options to cover the whole shaft footprint.

The Ideal Lifting Beam Solution is manufactured, delivered, installed, and tested in one continuous process by a qualified engineer, resulting in lower costs, improved on-site coordination, fewer site visits, and faster project turnaround.

Beam Solution Benefits

  • Ideal for Block, Steel, Pre-cast & Concrete lift shafts
  • One continuous process – Installation and testing in one day
  • Simplified shaft construction requirements: No padstones, no remedial fire stopping, no headroom/overrun reinforcement
  • Flexible and accurate multi-positioning options to cover entire shaft footprint
  • Reduced weight compared to traditional RSJ beams
  • Safe Working Load (SWL) = 1500KG

Thank you for getting in touch!

One of our team will contact you shortly.