Categories
Ideal Lifts Frame System IL2 School Structures Timber Construction

New Lift in Timber School, Chelmsford

New Lift in Timber School, Chelmsford

Interestingly, this new school project first came to us as an enquiry from a repeat Modular Construction client, before we then received another enquiry, this time it was for a timber frame build.  Ideal Lifts are specialists in lift installations for all Modern Methods of Construction (MMC) using our Ideal Lifts Frame System.

The end client eventually decided on the timber frame contractor, and Ideal Lifts were chosen to install the lift into this new 2-storey school in Chelmsford.

The contractor chose to install one of our traction IL2 Hybrid Access Passenger Lifts, which offers all the design and functionality of conventional passenger lifts and is designed to fit in only a 150mm pit with 2750mm headroom.

Provided with a motor room less (MRL) low energy traction-drive, which is integrated into the lift shaft, and unlike traditional hydraulic platform lifts there is no need for a separate (non-fire rated) control cabinet.

Our IL2 Hybrid range comes with automatic sliding doors, one-touch push button controls, 2-hr fire certified landing entrances and an enclosed cabin.

This project was one of the first with our new standard linear LED lighting and also included an optional restricted key fob access to allow the school to limit the use of the lift.

All of our lift installations are Open Protocol and are fitted as standard with our Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site.

Categories
Apartments Ideal Lifts Frame System IL3 Light Gauge Steel Structures

Simplifying Hybrid Construction

Simplifying Hybrid Construction

Hybrid construction building

A private housing developer approached Ideal Lifts to assist with a hybrid construction project after we were recommended by the Steel Frame System (SFS) manufacturer.

The Ground and first floor were constructed in hot rolled steel with block infill. The 2nd to 4th floors above were built with a lightweight steel frame system (LSFS).

This mixed-use development has commercial units on the ground floor and private apartments above.

We installed one of our Energy Efficient IL3E passenger lifts and our Ideal Lifts Frame System, which is designed to accommodate changes in shaft materials at different floors and remove the need for a labour-intensive concrete shaft.

The project was further simplified by removing the need for the contractor to build lifting beams at the top of the shaft for lift the installation and test these in situ as the Ideal Frame System included for these.

All of our lift installations are Open Protocol and are fitted as standard with our Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site.

Categories
Apartments Ideal Lifts Frame System IL3 Structures Timber Construction

Luxury Lifts for Luxury Living

Luxury Lifts for Luxury Living

Luxury apartment building by a pond

A repeat client came to us with a luxury new contemporary village development proposal in West Sussex. 

The timber building had originally been designed with a traditional masonry block lift shaft, but our experienced technical team advised the client and architects about our Ideal Lifts Frame System, with the same footprint as a masonry shaft in timber.

Using our frame system the developer was able to avoid various construction issues associated with building block lift shafts in timber buildings, such as compromising the fire integrity of the lifts shaft as well as any potential trip hazards and expensive landing entrance repairs caused by vertical timber shrinkage

The clients required a luxury lift, with upgraded lift car and landing finishes which was in keeping with the luxury nature of the development.

Ideal installed two energy efficient, 240V single-phase passenger lifts, with dedicated communication platforms and managed SIM cards.

All lifts are fitted as standard with our Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site.

Ideal Lifts were appointed on an additional six lift site (also in timber construction) a testament to the benefits our Ideal Lifts Frame System brings to modern methods of construction.

Categories
Anti-Vandal Lift Apartments IL4 Light Gauge Steel Masonry Social Housing Structures

A Collection of Vandal-Resistant Quayside Lifts

A Collection of Vandal-Resistant Quayside Lifts

Gloucester Quays Ideal Lifts - BS EN 81-71 Vandal Resistant Lifts

Click on the links above for our Digital Magazines

Ideal Lifts Ltd. were approached by our repeat client, leading housing developer Crest Nicholson, who were working with one of England’s largest affordable housing providers The Guinness Partnership, to provide the lifts on a multi-block project by the historic Gloucester Quays.  The £85m waterfront scheme incorporates over 400 mixed-tenure homes, with a selection of 362 1&2-bed luxury apartments and 49 2&3-bed houses.

The Canalside project required Ideal Lifts Ltd. to install Category 2, BS EN 81-71 Vandal Resistant lifts in all blocks, with robust PEGASUS doors, finished in a durable linen textured stainless steel.

The project was of hybrid construction incorporating both traditional and Light Gauge Steel (LGS) blocks, we therefore installed some of the lifts in our Ideal Lifts Frame System and others using a direct wall-mounted solution.

In the LGS block the lifts were installed in our unique frame system for OFFSITE construction, removing the need for a conventional lift shaft.  The Frame System incorporates lifting beams, pit ladder and removes the need for scaffolding.  There is no need for additional special fabrication or steelwork inserts to be built in delivering a much-simplified repeatable process to the team.

The existing analogue telephone network will be switched off by 31 December 2025. Therefore, all the lifts were fitted with our optional Digital Communications Platform (DCP) providing the interface between the lift emergency Autodialler and a mobile telephone network, along with the additional option of a managed commercial grade SIM card package.

All lifts installed were our IL4 passenger lifts is for larger buildings and busy environments – to carry people higher and faster. Fitted with a premium variable speed motor room-less (MRL) gearless traction drive and can achieve 2 BREEAM credits.

Categories
IL3 Modular School Structures

Modular Low Carbon Pathfinder DfE School

Modular Low Carbon Pathfinder DfE School

MODULAR LOW CARBON PATHFINDER DFE SCHOOL

A modular client of ours knew just where to come when they won the contract to build a new 6,850m2 Department for Education (DfE) pathfinder Low Carbon School in Modern Methods of Construction (MMC). The end client needed an accessible Part M4(2) lift for their new 3 storey building.

A key challenge was to reduce both carbon emissions and operational energy use. We therefore specified our IL3E Eco-Drive energy efficient passenger lift. The completed project achieved a 50% reduction in energy demand of the operational energy use and a 73% reduction in carbon emissions.

IL3 Eco-Drive, motor room-less (MRL) gearless traction drive passenger lift was ideally suited for this low rise building with moderate use. With an ever-increasing demand to reduce energy, our IL3 Eco-Drive passenger lifts use 35% less electricity than conventional traction lifts and can achieve two BREEAM credits. For more information about the IL3 Eco-Drive see our Video.

To compliment the stylish School design our ‘Essential Car’ was installed with durable powder coated RAL7032 Landing entrances.

As this is a Modular school, we installed our unique frame system for OFFSITE construction, removing the need for a conventional lift shaft. The Frame System incorporates lifting beams, pit ladder and removes the need for scaffolding. There is no need for additional special fabrication or steelwork inserts to be built in delivering a much-simplified repeatable process to the team.

The lift controller was designed to interface with the main building key fob security system to restrict access to authorised persons. A dedicated isolation switch enables the lift to be placed into unrestricted on occasions such as open days.

Categories
Apartments IL3 Social Housing Structures Timber Construction

The Shed/Y Sied just got bigger

The Shed/Y Sied just got bigger

Building

Showcasing our latest double lift installation, benefitting the residents of social housing provider Pobl in Newport, South Wales.

The apartments were constructed in timber frame which meant that the Ideal Frame System was specified to facilitate natural vertical timber movement.

Ideal lifts installed two of our increasingly popular, energy efficient IL3E Eco-Drive passenger lifts into this later living development.

The Ideal Eco-Drive passenger lift uses 35% less electricity than conventional traction lifts and can achieve two BREEAM credits. A fully compliant EN81-71, Category 1, Vandal Resistant lift is also available in this model.

During the construction of these stunning apartments, which incorporated solar panels and green roofs, the local community ‘adopted’ an old site office as a small meeting place which was known locally as The Shed/Y Sied, but unfortunately this was lost to make way for the new development.

When building names were suggested for the new development, the local community were vocal with the opinion that only one name was possible, ‘THE SHED/Y SIED’. This new bigger community hub now forms a vital part of this later living complex.

One of the passenger lifts is cleverly designed as a through-car to give access to the rear sloping gardens for the residents.

The lifts were also fitted with our Automatic Remote Monitoring (ARM) System. Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind. The ARM allows the lift to be monitored remotely enabling diagnoses, and on a number of tasks rectifying, without the need for site visits.

The award-winning site manager for this scheme, Matthew Hall, from J.G. Hale Construction had this to say about the lifts.

“WITH THE END OF THE DEVELOPMENT VERY NEAR, I JUST WANTED TO TAKE THIS OPPORTUNITY TO THANK YOU FOR ANOTHER FAULTLESS LEVEL OF SERVICE YET AGAIN. IDEAL LIFTS HAVE WORKED YOURSELF TO THE TOP OF THE LADDER TO BE ON THE LIST OF OUR A* PERFORMERS.

FROM QUOTATION TO COMMISSION, YOU MAKE EVERYTHING EASY FOR YOUR CUSTOMER. COMMUNICATION IS ON POINT AND THE END PRODUCT IS THE BEST I HAVE SEEN.

THANK YOU VERY MUCH FOR ANOTHER COMPLETED DEVELOPMENT, I LOOK FORWARD TO WORKING WITH YOU ON THE NEXT.”

Ideal Lifts Director, David Whorwood said “This development is one of the most impressive I’ve seen in a long time. It was great to tour the completed site and see the contribution our lifts have made to this important new building.”

Our history with Housing Associations is long, varied and successful.
Ideal Lifts understand the importance of long term maintenance and the role of using components from established suppliers. We are able to provide an “enhanced package lift” which meets the Housing Associations exact specification.

Categories
Evacuation Lift IL3 School Structures Timber Construction

New Timber SEND School – Evacuation Lift

New Timber SEND School – Evacuation Lift

BS9999 Evacuation Control Lifts Panel

A repeat client of ours knew just where to come when they won the contract to build a new Special Educational Needs & Disability (SEND) school in Modern Methods of Construction (MMC). The end client needed an accessible lift for their new 2-storey building which contained 10 different learning spaces including a food technology room and art room.

This state-of-the-art school required a passenger lift with BS9999 Evacuation Control. This allows the lift to be used to evacuate disabled students in the event of a fire.

Designed to meet the specific needs of pupils with profound, severe, and complex special educational needs (PSCN) at this SEN School, our energy efficient IL3 Eco-Drive lift was installed in our unique frame system for MMC, removing the need for a conventional lift shaft. Also included in the specification were larger landing colour LCD displays to aide those with visual impairments.

Categories
Structures Timber Construction

Tough Lifts In Timber Frame Construction

Tough Lifts In Timber Frame Construction

Building

This £12.5m Local Authority redevelopment of a former brownfield site provides a mixed-tenure development that will offer homes for affordable rent, shared ownership, and private sale.

There were 2 key deciding factors with the selection of Ideal lifts.  The first being the building was Timber Frame with Ideal Lifts the market leader installing lifts into this method of construction.   Being a repeat client of ours experienced with the Ideal Lifts Frame System , the contractor recognized the construction problems and issues with masonry lift shafts within timber buildings and adopted an MMC solution throughout.

The second deciding factor was the need for fully compliant Vandal Resistant, BS EN 81-71 (Category 1) lifts. The Local Authority housing required a robust solution, which was fully achieved on this project.  For more information on BS EN 81-71 Vandal Resistant lifts see our Guide.

Ideal Lifts installed two frame-mounted, 8 -person passenger lifts within the 4-storey apartment blocks, finished with our stylish Satin Stainless-Steel lift cars and landing entrances.

This lift was also fitted with our Automatic Remote Monitoring (ARM) System.  Our advanced 24/7 ARM system provides building owners, managers and users additional confidence and peace of mind.  The ARM system allows the lift to be monitored remotely which enables the service company to diagnose and resolve issues without having to visit site, resulting in improved response times for faults and reduced lift downtimes by knowing which replacement part is needed before we even attend site.

The development, split across two separate sites, will greatly boost essential housing provision with new homes. The 1st site provided 29 apartments, whilst the 2nd site provides 9 townhouses to the rear of the site and 24 apartments at the front.

Categories
Ideal Lifts Frame System Rail Network Structures

Overbuild and the Ideal Lifts Frame System

Overbuild and the Ideal Lifts Frame System

Overbuild

The Government has recently called on councils to get building over railway stations.

We are very pleased to have been asked to contribute to the Linear Infrastructure Overbuild Guide commissioned by Buildoffsite.

The report was inspired by WSP’s ‘Out of Thin Air – Building over London’s rail lines’ report and the subsequent ‘Out of Thin Air – One year on’, it aims to do 3 things:

  1. Make more potential sites viable, creating homes and offsite project opportunities
  2. Enable stakeholders to consider how to unlock more of this potential
  3. Help more developers and suppliers to be involved with infrastructure overbuild

The reports identify the opportunities overbuild offers as a way forward with the acute housing shortage the UK is facing.

The lightweight Ideal Lifts Frame System weighing 95% less than pre-cast lift shafts, designed for MMC, is also perfect for rail overbuild projects and existing buildings which need to be extended vertically.

Ideal Lifts Off-Site

See further information about our latest (existing build) rooftop development lift installation in Northampton here.

If you would like to discuss your passenger lift requirements with one of our experts please get in touch via our ‘Contact Us‘ page, or call us on 01837 659999.

Categories
Care Home IL4 Structures Timber Construction

Care Home in Winnersh

Care Home in Winnersh

Care Home Building

Ideal Lifts 8 and 13-person high efficiency motor room less passenger lifts, fitted with contemporary laminated wall boards and low energy LED lighting.

Following detailed discussions regarding the client’s requirements and Building Control Department, the half-height mirror normally fitted to the rear wall were replaced with wallboards to suit resident’s specific needs. Exceeding the requirements of Part M of The Building Regulations, all lifts are fitted with ‘curved in’ handrails to all sides of the lift car.

Both lifts were installed into Ideal Lifts Frame System (structure) within the timber shaft, a fast and efficient solution designed to accommodate the natural vertical settlement of the timber framed building.

Ideal Lifts are extremely well positioned to install a wide range of frame mounted passenger lifts including 6, 8, 10 and 13-person capacities.

Thank you for getting in touch!

One of our team will contact you shortly.